Execute the pen of practical work to draw the beauty of urban construction - Jincheng City Public Construction Center to project construction to promote high-quality development chronicle
Bathed in the warm winter sun, walking in the streets and alleys of the city, only to see the fruitful urban construction
The east section of the ancient Academy Street, Bailing Street and Zezhou North Road intersection of a smooth road, like a bridge to the hearts of the people; sponge city comprehensive demonstration project construction to speed up the advancement of our city as if "will breathe"; city exhibition hall, the Third People's Hospital and other people's livelihoods of the public buildings rose, highlighting the Jincheng City, the strong momentum of urban construction ......
In 2023, Jincheng City Public Construction Center, as the main force of urban construction in the main city, always practicing the people's city people build, people's city for the people's concept, closely linked to the municipal party committee and municipal government "three-year action" deployment, focusing on the needs of the masses, strict implementation of the "quality, boutique, create classic "work requirements, in order to seek practical results of the spirit, in-depth promotion of project construction, carefully build high-quality engineering, depicting a livable, livable, livable, livable, livable cityscape.
Roads "on the new" urban road network pattern again upgraded
City construction, the road first. 2023, Jincheng City Public Construction Center around the city to open up the "arteries", improve the road network pattern, for the development of the city "tendon and vitality", a new project of urban road construction, for the development of the city to bring vitality.

The picture shows the intersection of Bailing Street and Zechou North Road renovation project.
Bailing Street and Zechu North Road intersection renovation project is undoubtedly the city of Jincheng dredging road "thrombosis" of the finishing touch. Bailing Street is the North Shidian area, Danhe New City and the main city interconnectivity of the main road, but into the intersection of Zechou North Road but there has always been a problem of poor traffic conversion, the road is in urgent need of renovation and upgrading. 2023 April 1, Jincheng City, the public construction center of the people's livelihood needs as its own responsibility, and efforts to solve the pain points of the city's development and the difficulty of the efforts to implement the intersection of the Bailing Street and the Zechou North Road reconstruction project, respectively, on Zechou Road, the north and south sides to set up two underpasses. North and South sides to set up two underpasses, to overcome the difficulty of demolition and relocation, the rainy season construction is unfavorable and other difficulties, the use of just more than 100 days to achieve the full line of traffic.
"As 2023 China - Shanxi (Jincheng) Recreation and Nutrition Industry Development Conference supporting facilities, in the process of engineering construction, we adhere to the demolition and reform units to hand over a meter of work surface, earth and structural construction closely followed by advancing the principle of one meter, construction operations three shifts, each process reasonable cross-construction, to ensure that the opening of the car is completed ahead of schedule." The project responsible person Xiao Yang introduced, in order to integrate with the surrounding landscape, under the channel for the first time using the top of the tunnel point light source design, can be freely combined to change the color, the two sides of the addition of fire prevention boards, supplemented by the water droplet waistline design, to create the visual effect of the Star Tunnel, Fengcheng Recreation Demonstration Zone and become an important landscape.
Ancient Shuyuan Street is also a typical disconnected road.2023 In May, the construction of the 775-meter-long eastern section of the Ancient Shuyuan Street project officially began. "This viaduct is the first cast-in-place pre-stressed concrete box girder structure bridge in Jincheng City, which is much more difficult to construct." Standing in the street has been completed and opened to traffic in the ancient Academy Street, the project responsible person Yan Wugang told reporters that the project team continues to optimize the construction program, the upper part of the bridge using pre-stressed concrete continuous beam single box four-compartment structure, piers using vase-type abutments, the bridge deck using a word-shaped bridge deck, safe and practical and beautiful. In the use of materials, the whole bridge piers and columns use steel shaped templates, pre-stressed box girders using a molding of the water template. In terms of sound insulation and noise reduction, considering the proximity of the bridge to the surrounding residential areas, the most advanced noise barriers and high-strength anti-collision guardrails have been set up on both sides of the bridge, which effectively protects the daily life of the surrounding residents from being affected by the working order. More noteworthy is that, in the design of flood drainage, Green Park District to the construction of the North Road flood control box culvert design, according to the size of the drainage volume of different pile locations, designed a different box culvert cross-section, which greatly improves the road flooding capacity.
"Now the road is wide, all the facilities in place, flood season rain no longer have to worry." The eastern section of the ancient Shuyuan Street road has greatly improved the travel environment for residents, and has been praised by the surrounding public: this livelihood project deserves praise!
Paisong Street - Fengqi Road, Southeast New Area micro-circulation roads, Wenbo Road, Wenfeng Road connectivity project ...... Jincheng City Public Construction Center to steadily promote the construction of a number of road projects, the people in a little bit of change in the people see the well-connected urban transportation system is gradually taking shape.
Systematic promotion to create a "breathing" sponge city
After the sponge transformation, Fengxi Plaza completely changed: the activity site is more abundant, the public can run, exercise, leisure, landscape; roads, greening fully integrated into the sponge concept, under the concave green space, permeable paving, rain garden and other facilities effectively accept, stagnation, purification of urban rainwater, improve the region's ability to prevent flooding and drainage.

Pictured is the Fengxi Plaza sponge demonstration upgrading and renovation project.
"Sponge Square can not just change a brick, the doorway under the ground is still big." The project manager Tian Aijun introduced, Fengxi Square renovation all use permeable pavement, according to local conditions, choose permeable asphalt, imitation stone permeable brick, gravel seepage pool, good seepage and permeability can quickly solve the problem of waterlogging after the rain plaza, but also can be very good supplementation of groundwater, to maintain the balance of supply of groundwater resources to alleviate the pressure of the city's water shortages. At the same time, a new 400 cubic meters of rainwater collection and storage tank, rainwater falls on the square, through the drainpipe convergence to the storage tank, after treatment is used for greening irrigation. A variety of facilities decentralized layout combined to form a complete sponge system, respectively, set up filtration, seepage and overflow of different rainfall levels such as rainwater treatment, truly "small rain does not pool, heavy rain does not flood, the water body is not black and smelly, the heat island has to alleviate".
Diversified sponge facilities and landscaping efficient combination, as if in the rain garden, which can not be separated from the efforts of the Jincheng City Public Construction Center. In the process of project construction, Jincheng City Public Construction Center give full play to its own professional and technical team advantages, the use of 2022 set up a gardening and greening technology group, on-site guidance Fengxi Plaza landscape greening and beautification work, carefully selected tree species, flowers, integrated arrangements, scientific layout, the formation of a clear-cut, harmonious and beautiful three-dimensional landscape scroll, so that the public can deeply feel the beauty of nature, the beauty of ecology. The picture shows the parking lot of Baima Temple Amusement Park.

Pictured is the Baima Temple amusement park parking lot sponge demonstration upgrading project.
According to reports, Jincheng City, successfully selected by the national systematic territory-wide promotion of sponge city construction demonstration city, Jincheng City, the public construction center to take the initiative to play an active role, and actively act to accelerate the sponge city comprehensive demonstration project construction, and strive to create a "will breathe" sponge city. The project's total transformation and upgrading area of 207834 square meters. Specifically, including: Baima Temple Amusement Park parking lot sponge demonstration upgrading and renovation project upgrading area of 10272 square meters, Fengxi Plaza sponge demonstration upgrading and renovation project upgrading area of 36,188 square meters, the Municipal Party Committee School sponge demonstration upgrading and renovation project upgrading area of 102,151 square meters, sponge demonstration unit upgrading and renovation project upgrading area of 25,086 square meters. At present, the baima temple amusement park parking lot project and the municipal party committee school, fengxi square and a number of sponge city comprehensive demonstration project has been completed, the general public effectively enjoy the sponge city brought "ecological dividends".
In addition, Jincheng City Public Construction Center in recent years, according to the city's waterlogged points of the investigation and research, the preparation of a systematic management of urban flooding implementation plan, identified 20 flood-prone waterlogged points, through the replacement of drainage pipes, increase the rain grates, widen the river, and further improve the city's drainage system, improve the capacity of the pipe network and the efficiency of rainwater infiltration, to alleviate flooding waterlogging, to achieve the degree of "high water High drainage, low water and low drainage", to raise the standard of urban flood prevention and control to one in 30 to 50 years.
Accelerating the rise of a livelihood of public buildings groundbreaking
Actively respond to people's concerns, craftsmanship polishing construction quality. A series of people's livelihood projects, everywhere there are public construction of busy figures.
In Jincheng City, the third people's hospital project construction site, machine roar, vehicle shuttle, personnel machinery "full throttle", an excavator waving long arm, a transport vehicle out of the fish, a drilling machine around the clock, the scene a hot scene.

Pictured is the Third People's Hospital of Jincheng City (rendering).
Jincheng City, the third people's hospital project is located in the north side of Shunan Street, east of Chayuan Road, the total land area of 98 acres, the design scheme for the 500 beds, the construction area of about 88,000 square meters, started in May 2023, the construction period of 23 months. The project incorporates the concept of integration of peace and war, in the play of infectious disease diagnosis and treatment on the basis of the advantages of the surrounding area for the public to provide basic medical services, to create a "large specialties, small comprehensive" new development model, is the city of Jincheng to improve the layout of medical resources, to enhance the level of hardware construction of the Southwest Area of medical facilities of the people's livelihood projects.
"At present, we are in the process of earthworks and the management of the mining area, simultaneous grasp of the main project construction of the outpatient medical building, under the premise of ensuring quality and safety, make every effort to accelerate the progress of the project, and strive for the early completion of the project." Liu Jie, the person in charge of the project, said that they take the creation of provincial high-quality engineering as the construction goal, the construction of the whole process of BIM technology, the strict implementation of dust pollution prevention and control, safety and civilized construction and other requirements, and strive to create a standardized, intelligent demonstration site.
In the eyes of the public construction people, each project is not simply to complete the task, but poured feelings and efforts. Project promotion process, Jincheng City Public Construction Center actively practicing the first-line work method and regular scheduling and other mechanisms, the project team daily on-site, the leaders in charge of a daily scheduling, the main leader of a two-day scheduling, the central office tracking supervisors; the whole process, the whole process of service projects, combined with the experience of the work, optimize the construction program and organizational plans; in-depth project line, supervise the progress, grasp the safety, quality, solve problems, and to ensure that problems do not stay overnight. Ensure that the problem does not stay overnight, everything is guaranteed; active communication and coordination, with environmental protection, urban management departments to communicate, approved 24-hour construction permit, to help the project completed as soon as possible, put into use.
From the third people's hospital in Jincheng City to the city exhibition hall, in the Jincheng City Public Construction Center to promote the full force of a number of key projects groundbreaking, a livelihood public buildings to accelerate the rise, convergence of economic and social development of high-quality surging kinetic energy.
One step at a time, a boutique. At present, under the strong leadership of the municipal government, Jincheng City Public Construction Center is not wait for the sense of urgency, the sense of responsibility of the fast dry work, and comprehensively promote the construction of the project to public body, to build for the task of accelerating the promotion of high-quality development and construction of a common rich new Jincheng to make a new and greater contribution. (Reporter Yan Nisha correspondent Li Jiaying)