Home > Jincheng News

Jincheng: Make rivers beautiful and peaceful

2024-01-05

Let the river beautiful and peaceful - Jincheng City vigorously carry out river ecological management overview

Water is the source of life, but also the basis for survival. In recent years, Jincheng City, in-depth implementation of the CPC Central Committee, the State Council to accelerate the construction of ecological civilization decision-making and deployment, seize the Yellow River Basin ecological protection and high-quality development of a major national strategic opportunity, adhere to the high level of promotion, efficient implementation, and strive to achieve the scientific guarantee of water security, systematic restoration of the water ecosystem, the comprehensive treatment of the water environment, and the efficient use of water resources target.

 

Adhere to a high level of promotion, river ecological management has begun to see results

 

Jincheng City, the river basin area greater than 50 square kilometers of the river has 70, of which, the Yellow River Basin 55, the Haihe River Basin 15; Qin River, Dan River is the city of Jincheng's two big rivers, in the territory into an independent water system. Over the years, due to a combination of factors, runoff reduction, water pollution, drought, ecological vulnerability, and continue to improve the river water ecosystem is imminent.

 

In accordance with the provincial government issued the "Qin (Dan) River Basin ecological restoration and protection planning (2017-2030)" requirements, Jincheng City, the deployment of the Qin into the Dan cross-basin water transfer and recharge project and the main urban area of the clear water reflux work, completed the "14th Five-Year Plan" during the Qin (Dan) River Basin management planning, the main urban area of the river. Important rivers have all formulated a clear water re-streaming project program. Deployment of the city's river and lake governance management, the development of small and medium-sized rivers in 2023-2025 and flood control capacity enhancement project rolling plan, the preparation of the completion of the Jincheng City, flood control capacity enhancement project overall program and Taiji Lake (East Jiaohe Reservoir), Jiuwuxian Lake (Duhe Reservoir) ecological restoration planning. At the same time, actively raise funds, carefully organized and implemented, and constantly accelerate the progress of ecological management of rivers.

 

According to statistics, since 2011, the city invested a total of 848 million yuan of financial funds (694 million yuan above the provincial level, 154 million yuan of municipal and county funds), 1.789 billion yuan of social financing, a total of 17 (section) of the river governance, governance of 168.24 kilometers of the river, of which 34.2 kilometers of the Qinhe River mainstem, the Qinhe River tributaries 62.73 kilometers; Danhe River mainstem 41.49 kilometers, Dan River tributaries 29.82 kilometers.

 

Implementation of high-quality projects to create ecological restoration of rivers and lakes, "Jincheng sample"

 

After entering the winter, the cold air frequent visits, but in Yangcheng County, Runcheng Town, Runcheng Village, Runcheng lock expansion site, the Pacific Construction Group workers are not affected in the slightest, every day is still in the ancient river masonry bank protection construction. Members of the task force, Yangcheng Water Affairs Bureau of Water and Drought Hazard Defense Unit Chief Meng Jinfeng told reporters that masonry bank protection work by the weather is not a big factor in the interference, will strive to next year's flood season before the Runcheng locks at the bottom width of the river channel from the original 55 meters widened to 88 meters, flooding capacity to 20 years of flood control standards.

 

Qinshui County Jiafeng town and Zhengcun town site, workers are also working feverishly in the water ecological integrated management project construction.

 

Yangcheng County, Runcheng Town, Qinshui County, Jiafeng Town, Jincheng City, 100 miles of Qin River ecological and economic zone of the pioneer construction project location. Since the construction began in May last year, they in accordance with the municipal government "environmental governance, smooth transportation, cultural development, layout, industry, ecological beauty" planning and construction of the general requirements, and seriously implement the "municipal integrated control + county-level implementation of their own" work requirements, highlighting the "Quality, excellence, create a classic" concept lead, and vigorously promote the construction of the project. Up to now, the Yangcheng section of the Cook's Bay Wetland Park, Gudu Wetland Park, Run Lake Wetland Park, 16.9 kilometers of river governance, the construction of 11 kilometers of sewage main. The bottom width of the river channel in Split Mountain Pass is widened from 28 meters to 88 meters, and the flooding capacity reaches the standard of one in 50 years. Qinshui section of the Wuan Wetland Park construction is completed, the three estuary node is taking shape.

 

Hundred miles of Qin River ecological and economic belt project is one of the major traction projects in Jincheng City. The project is based on 1982 square kilometers of planning scope, on both sides of the ecological management area, ecological conservation area and ecological construction area, integrated promotion of the whole basin planning, construction and management. The ecological management area is based on the Qin River main stream guide line, and the implementation of level control. Ecological conservation area with special important ecological functions or ecologically sensitive and fragile areas as the focus, follow the "natural restoration-based, artificial restoration as a supplement" concept, the implementation of strict control, in principle, does not allow the development and construction. The ecological construction area focuses on areas outside the ecological management area and the ecological conservation area, and implements guidance and control.

 

Ltd. general manager Wang Xiaoxiong also combed the construction timetable for the reporter, last year, the preparation of the completion of the pilot area planning program, sorting to determine the project list, and start the implementation of the pilot area project to achieve a year's start; 2025, the pilot area project is basically complete, to create a Qinhe River Basin with regional characteristics, cultural traits, governance characteristics of the northern watershed governance prototype; In 2027, the hundred miles of Qin River ecological economic zone ecological governance area, ecological construction area, ecological conservation area project construction comprehensively, "environmental governance, smooth traffic, cultural development, layout, industry, ecological beauty," the situation basically formed; 2035, market-based means to revitalize, optimize, and grow the ecological construction resources and assets, built National first-class, the province's leading ecological economic "development zone".

 

Fine management and care, promote the river ecological management upgrade

 

Every morning, Zezhou County, Daji Town, Ma Reed Village, there is a small figure along the stream slowly, or squat down to look at, or stand straight out of the distance. Her name is Wu Zhifang and she is the village-level river chief of the Mawei section of the Baishui River.

 

In order to realize the water clear, river smooth, green banks, beautiful scenery, people and river management goals, Wu Zhifang always adhering to the water responsible, water responsible, water responsible for the work of the concept of the village river is divided into five segments, each segment is responsible for two party members and cadres to do the flood season day patrols, silt at any time to clear the effective solution to the village of Ma Wei river obstruction, the river pollution problems.

 

In order to create a new situation of river and lake management, Jincheng City issued a "comprehensive implementation of the river chief system implementation program" "comprehensive implementation of the river and lake sheriff system implementation program", the formation of the river chief to grasp the implementation of the inspector general to grasp the supervision of the river and lake sheriffs to grasp the law enforcement of the "three-long rule of the river" model; and actively explore the "river chief +" working model, in the province, the "river chief +" working model, the "river chief +" working model, in the province. " working mode, the first in the province to establish the "river chief + river and lake sheriff" "river chief + inspector general" "river chief + river chief assistant + river patrol" working Mechanism, through the river and lake management and care of the "last kilometer". In-depth implementation of the "four chaotic" special action, the issuance of "on the in-depth promotion of the river and lake "four chaotic" normalization notice", the development of "river inspection management system (for trial implementation)", to achieve the normalization of the river inspection to ensure that the "four chaotic". "Four chaotic" problems found in a timely manner, timely rectification, dynamic zero.

 

It is understood that the city of Jincheng continued to promote in-depth "clean river" since the special action, a total investment of more than 63.5 million yuan, a total of 454,900 cubic meters to clean up the river garbage and illegal piles, the investigation of water-blocking forests and 356 acres of high-powered crops, clean up the illegal construction of 16,200 cubic meters. Completed the city's more than 50 square kilometers of rivers impede the river flooding prominent problem investigation, found to impede the river flooding prominent problems in a total of 36, to the municipal government issued a document "impede the river flooding prominent problems of special rectification and implementation of the program", effectively promote the management of rivers and lakes upgrading and upgrading.

 

River ecological management of the solid progress, enhance the river flooding capacity, in recent years, the river embankment did not occur across the embankment accident. At the same time, the water ecological environment has further improved, and in the 2019 provincial water resources assessment, seven of the city's nine national and provincial examination monitoring sections have achieved stable or better than three types of water quality, and the remaining two sections (GaoPing River West section, Baishui River section) eliminated the inferior five types of water bodies, which are all up to the requirements of the assessment objectives. This is the first time in 20 years the Dan River outbound cross-section of water quality standards, fully reversed the situation of only the penalty is not rewarded.

 

The next step, Jincheng City will continue to make efforts to build a river protection pattern, is committed to improving the water ecological environment of the river, and strive to build ecological harmony, environmental friendliness, people's satisfaction with the happy river. (Reporter Li Jinbo)